SEMMMMS Logo

03. Environmental Statement

All reports are PDF files:

Title              Report No.
Volume 1 - Non Technical Summary   1007/6.15.2/188
Volume 1 - Main Text   1007/6.15.2/189
Volume 2 - Figures   1007/6.15.2/190 (See below)
Volume 3 - Appendices
   1007/6.15.2/191 (See below)

Volume 1 - Main Text - Environmental Statement contents:
Chapter 1 - Introduction  
Chapter 2 - Need for the Scheme  
Chapter 3 - Alternatives  
Chapter 4 - Existing Environment  
Chapter 5 - Proposed Scheme  
Chapter 6 - Consultation  
Chapter 7 - Scoping and Introduction to the Assessments  
Chapter 8 - Air Quality  
Chapter 9 - Cultural Heritage

Chapter 10 - Landscape and Visual Effects  
Chapter 11 - Ecology and Nature Conservation  
Chapter 12 - Geology and Soils  
Chapter 13 - Noise and Vibration  
Chapter 14 - Effects on all Travellers  
Chapter 15 - Community and Private Assets  
Chapter 16 - Road Drainage and the Water  
Chapter 17 - Cumulative Impacts  
Chapter 18 - Schedule of Environmental Commitments 

Volume 2 - Figures
Volume 2 Preliminary Chapters (1-4) 
Figures 5.1 to 5.44                                 
Figures 8.1 to 8.21                               
Figures 9.1 to 9.12                                
Figures 10.1 to 10.18                          
Figures 11.1 to 11.25                           
Figures 11A.1 to 11A.5 (Confidential - not on website)                     
Figures 11B.1 to 11B.5                   
Figures 11C.1 to 11C.8
Figure 11D.1                      
Figures 11E.1 to 11E.8                             
Figures 12.1 to 12.3    
Figures 13.1 to 13.11                             
Figures 14.1 to 14.9     
Figures 15.1 to 15.8                                 
Figures 16.1 to 16.8                               
Figures 17.1 & 17.2                  
                                       
Volume 3 – Supporting Appendices 
Appendices Front Page
Appendix 5A & 5B
   Appendix 5.A - Construction Environmental Management Plan
   Appendix 5.B - Site Waste Management Plan
Appendix 6.A - Consultation Summary (2009-2013) 
Appendix 7A & 7B
   Appendix 7.A - EIA Scoping Report
   Appendix 7.B - Scoping Opinion 2010
Appendix 8A to 8E 
   Appendix 8A - Legislative Context
   Appendix 8B - Local Authority Monitoring
   Appendix 8C - Scheme Specific Monitoring (2009) 
   Appendix 8D – Construction Methodology
   Appendix 8E - Designated Sites Information 
Appendix 9A & 9B
   Appendix 9A - Gazetteer and Impacts (2013)
   Appendix 9B - Field Works Results (2011) 
Appendix 10A to 10C
   Appendix 10.A - Landscape and Visual Method of Assessment (2013)
   Appendix 10.B - Sub Regional Character Areas (2013)
   Appendix 10.C - Visual Impact Tables (2013) 
Appendix 11B to 11E
   Appendix 11A - Badger Report (2010 and 2013) (Confidential - not on website)
   Appendix 11B - Bat Survey Report (2010 and 2013)
   Appendix 11C - GCN Survey Report (2010 and 2013)
   Appendix 11D - Otter Survey Report(2011 and 2012 (camera trapping))
   Appendix 11E - Phase 1 Habitat Survey Report (2011 with on site review of data 2013) 
Appendix 12A - Aecom Ground Investigation Report (2011) 
Appendix 13A to 13E
   Appendix 13A - Glossary of Acoustical Terms
   Appendix 13B - Construction Noise Assessment Guidance and Methodology
   Appendix 13C - Sound Level Meter Calibration Certification
   Appendix 13D Noise Survey Monitoring Data (2013)
   Appendix 13E BNL Calculations 
Appendix 14A - Footpath Monitoring Survey Report (2010) 
Appendix 15A - Agricultural Data Sheets 
Appendix 16A to 16D
   Appendix 16A - Methods
   Appendix 16B - Baseline
   Appendix 16C - Calcs and Results
   Appendix 16D - Mitigation

 

 

To find out how we use cookies on our website please read our cookies privacy notice.